![]() |
#1
|
|||||
|
|||||
![]() Ok, dumbass here made a boo boo. My 90 is drilled in the bottom with a corner overflow, and dumbass here isn't used to a bottom drilled tank, so didn't take this into consideration when building the stand. The stand is finished now, so I'm hesitant to rip it apart (glued and screwed arg), but I have 2x4s on end (so 3 1/2" thick) right where the tank is drilled. #$%*@$%&@!!!!! So...I'm trying to figure out some brilliant idea to make this work with as little effort on my part.
![]() The only two options I can think of are; rip the stand apart and move the framing, OR silicone a chunk of glass in the bottom of the overflow to cover up the holes, and drill the back of the tank. The second idea is pretty stupid...but it's easier. ![]() Any thoughts? |