![]() |
#1
|
||||
|
||||
![]() I have 1" bulk heads, 75 Gal tank with black trim.
In relation to the black trim at the top, how far down should I be drilling my holes? 1 suggestion I have heard is the middle of the hole 3" below the trim. Anyone else agree/disagree? I don't have an overflow box as of yet. I'll be plumbing a Bean Animal. |
#2
|
||||
|
||||
![]() I would go at least 2" to the top of the hole from the trim. On my own tank I'd probably go 6" to center for piece of mind.
__________________
250G DD LED SPS R.I.P. 180G LED SPS 80"x36". 300G custom build Owner of Mountain Ridge Heating and Gas Class A gas fitter, HVAC |
#3
|
|||||
|
|||||
![]() If I remember correctly, the correct measure is 1 1/2x the hole diameter from the edge and 2x the hole diameter from another hole.
|
#4
|
||||
|
||||
![]() If it were your tank how long would you place the holes? I need to take into account the elbows for the drains for the BA overflow.
|
#5
|
|||||
|
|||||
![]() Are you thinking of doing an internal or external overflow?
|
#6
|
||||
|
||||
![]() Internal
|