Transfer everything a week ago, everything seems to be happy, took long time, especially to fill up the tank with new water, the Rodi is a bit slow, also manage to replace the ballast on the powermodule, just like the video, the difference was the video is 5 minutes long, took me about 2h lol.
Still cleaning the wires in the sump but everything else is set up already, had a bit of a leak at the ball valve but was an easy fix because installed the unions(thanks Ian).
Went with a low rock scape cause I like the sticks growing up, going to take long time but I'm patient , lol
Noticed an insane PE at night time.
Here some bad pics from iPhone ahahahah







Sent from my iPhone using Tapatalk