Work on electrical is done.

Plugs are set on there own 20amp breaker. Plugs are GFI. I have 4 near water storage and Ato area, and 6 near main control board for sump/aquarium use all in the sump room. Wires are protected by pvc conduit. Also working on the plumbing.