I have been able to get a little bit done over the last few days. The structural portion of the stand is done. 2x4 studs, 2x6 joists 5/8" sub, 1/2" foam and 1/2" oak sheathing. I planed any irregularities out of the top of the stand so its quite flat however the house slab is not so I'll have to shim the base once its in. I plan to do some sort of recessed panel finishing to it later once the system is running.
Plumbing for the closed loop is coming along slowly. Once it and all of the other plumbing for the overflow, return, and skimmer input are done there won't be much room left to move.
