Got my drawers built. Still missing the right glide for the lower left drawer (got 2 lefts instead of a right and a left) so that's why it looks a bit off kilter. Got the top doors mounted with the hold up hardware. Still have to spray all the doors, hopefully that'll happen this week.
Today I concentrate on plumbing the tank to sump and see if I can't get that done.
