Here these beasts are all plumbed and ready to go!
Also got the finishing touches on my manifold. 4 X 1/2" barbed fittings to go to my reactors/UV.
Frag tank drains are all plumbed.
And the fuge drain from fuge to main sump is done as well! I have to use a different (frikin expensive) ball valve from western pump, because of the lack of space, and the slight bend in the plumbing into the other closet. This one was a little shorter, and allowed me to use the two 45 degree fittings to make the bend. Only thing is.... the handle is orange. So I will remove it and paint it red like the rest asap! Call me OCD... But it has to match!
