LOL that is exactly what I was thinking of doing as I drove back from lunch
My original plan was to have a solenoid on the input to the RO system and then feed the output of the RO to a Kalk reactor and then to the sump
This will still be the end plan but due to a lack of time I pan on using a plastic pail as an intermediate reservoir. I will then have an overflow to the drain. Instead of switching a solenoid I will just turn a PH on and off.
Joel
|