View Single Post
  #4  
Old 09-15-2004, 07:33 PM
jgoldsney jgoldsney is offline
Member
 
Join Date: Apr 2002
Location: Sherwood Park
Posts: 196
jgoldsney is on a distinguished road
Default

LOL that is exactly what I was thinking of doing as I drove back from lunch

My original plan was to have a solenoid on the input to the RO system and then feed the output of the RO to a Kalk reactor and then to the sump

This will still be the end plan but due to a lack of time I pan on using a plastic pail as an intermediate reservoir. I will then have an overflow to the drain. Instead of switching a solenoid I will just turn a PH on and off.

Joel
Reply With Quote