I have the new drilled bulkhead out the back done with a 1in. duraso type stack as shown for the bean overflow. This will be my main flow stack. One of the 3/4in, will have the Duraso style but just a hair higher and with the air tube assembly. The third is a straight 1in stack and the highest as an emergency flow. Of course as mentioned before its still only a 3/4in through the bottom.
Finished my over flow glass.It will be topped with eggcrate as all my tanks have always been.
Pics this weekend. Bought 2 more lengths of 1 in. pipe and a length of 3/4 in for the return. AND $80 worth of elbows, valve, unions and the such.
