Thread: Greg's 75g
View Single Post
  #722  
Old 06-13-2013, 06:23 AM
gregzz4's Avatar
gregzz4 gregzz4 is offline
On Hiatus
 
Join Date: Oct 2011
Location: Burnaby, B.C.
Posts: 4,890
gregzz4 will become famous soon enough
Default

Tonight was a total-loss for studying
I opened some paper mail and ended up dealing with some personal crap until 8pm
By then I'd decided it was OK to put some time into modifying the canopy

I've realized some limitations and see I need access doors on the ends, so here's what I have so far ...
Doors are cut, sanded, primed and painted inside
Tomorrow, right before studying, they will get a coat of black on the outside and ends. Then another coat of black after studying before bed



For my home-made food, so far I'm having success using a Foodsaver jar/can lid on a small glass container thingy
Each night I open it briefly to grab a cube and I'm not yet seeing any signs of freezer burn ...



And, because I was growing very tired of dealing with a True Union ball valve to adjust the return flow/overflow level in the DT, I finally (after 6 months) got around to re-doing the plumbing with a Gate Valve that I bought, you guessed it, 6 months ago







The 3rd nem has moved into a spot that I am sure it's not going to like long-term
I'm hoping it doesn't move into any SPS territory anytime soon as I, have I said it before ?, don't have time for extra stuff
Jeez, I almost forgot to add the nem pic
I gotta get some sleep ....

The third nem is the one inside the overhang, underneath and to the right
It used to be between the two others
And, the big one looks like it's going to split again



So much to do, and so little time to sleep
Thanks for looking
I hope to have better updates once I'm caught up with, well, life
Reply With Quote