Got a little more work done and started to fill it.
I put up some drywall on the ceiling above the tank.
This is the last screw.... and how close it made it before my last of 8 batteries died and I couldn't find a screw driver (left my tool bag at work).
Of course right. I ended up using a robertson and a hammer to get it to a point I could mud over it.
Look water is finally going in!
After about 24 hours
And a little look at how the show side of it is turning out. And yes I know I need some staples for the electrical.
I have a heater in it right now with a power head, I want to start getting the salt where it needs to be and the temp so I can put a couple rocks in there.
I need to finish the plumbing, but waiting on some vibration isolation to mount the pump on.