I've done it before with a 150 g. Worked well. Had the overflow built ahead of time. Then drilled it with it 1/3 full. Then silicones the overflow in. Refilled the tank up to the level of the new overflow, then ran it with powerheads while the silicone cured overnight, then refilled it after plumbing the new
Overflow. Hope this helps.
|