View Single Post
  #3  
Old 04-27-2011, 12:13 AM
asylumdown's Avatar
asylumdown asylumdown is offline
Member
 
Join Date: Jan 2010
Location: Calgary
Posts: 1,806
asylumdown is on a distinguished road
Default

how is it wired to your R/O unit/over what distance? Does it shut off the vertex unit completely? is it something I can put the wires in for now, or will it need to be installed at the same time as the R/O unit (which is months and months away from being ready, but the walls are about to be closed in with drywall)
Reply With Quote