Good things come to those who wait! You realize you are doing a huge build here right!! LOL! Its going to a beauty.......and better to do things right. You will be having fun here very soon!
Quote:
Originally Posted by michika
Yeah its for an area where one side is off by 1/8" and the other is by like 1.5" or something. I'm just the poor soul who has to source it out. Its a huge PITA because its whats stopping us from water testing right now. Its making me so frustrated that I can't just fill Tibet up. Essentially its the outside wall between Tibet and the water change system at the back of fish room that needs to be filled. Otherwise if there is a spill/mess things won't drain right and we run the risk of a large flood spilling into other areas of the basement.
Also it doesn't help when I go to look at other people's threads with their pretty clams, fish and corals, the temptation to spend the cash set aside for the sump or more plumbing is really hard to resist. I think I'd feel so much better about how far the build has progressed if only I could water test it.
|