Now while the tank clears we started to run the wiring. I am crazy fussy when it comes to running piping lines or wires or anything. I really like all the wires to run in line and be nice and clean looking. Yes the end product looks simple, but that's the beauty of it. In the end if the lines look easy it was probably pretty tricky to put together but IMO well worth it.
I am not sure if I will run a controller on this tank yet. I do have an old RK2 sitting around the house somewhere that I might use but for the time being I am going to use an individually switchable power bar.
Here is the cabinet inside that we are starting with
Here you can see the ball valve that controlls the flow to the tank. The fridge and the lines coming out of the top are tight to the left side of the stand. This should give me enough space to always be able to reach the ball valve and install the power bar on the right side and always have decent access to it.
I put in a couple screws, and attached the power bar to the inside of the stand
It may be hard to see in the pic but I used the cable staples to attach all the lines to the side of the stand and keep them in line.
The plug on the far left of the power bar is for the fridge.
So for this power bar to have the switches on the bottom for easy access the cord had to be at the front side of the tank. To keep the lines clean I left a bit of space above the power bar and ran the power line to the back of the tank up here.
Now with the power bar installed and clean, we need some flow.
On the Cardiff we had been using 2 of the MP10's. We were not sure if this would be enough flow, but before we replace them with some MP40's we might as well give them a try and see if they will cut it for flow on a azoox tank. If they are enough flow we will probably upgrade them to a pair of MP10WES's but again we want to be sure first.
But to install the MP10's the holes were a little too small for the screws that we had on hand and well... I didn't want to make the trip to Home Depot..
So its time to break out the drill again!
And sure enough they fit just fine now
I didn't want the cables to be in the way of the ball valve so I installed the pumps on the left side of the back of the stand.
I zip tied the lines coming out and down from the controller and the line going back up to the tank together so that it looked clean.
For the power supplies I didn't want a birdsnest behind the stand so I zip tied all the lines together and stuck them on the back of the fridge. With the tank against the wall and now full of water I couldn't get a pic of this but I can fill in more details if anyone is interested.
Ran the power lines to the switchable power bar and tacked the lines down.
Here is a full shot from outside the stand
