View Single Post
  #8  
Old 11-13-2010, 06:19 PM
burrows14's Avatar
burrows14 burrows14 is offline
Member
 
Join Date: Aug 2009
Location: south surrey
Posts: 468
burrows14 is on a distinguished road
Default

You would be good to go in 15 mins. I have used both plumbing a bunch of friends tanks. I always use the prime the fittings and let it dry completly before glueing. Be genourous with the glue and make sure to give the pipe a quater turn to make sure their is no air bubbles and the glue is spread evenly and then use paper towel to wipe off the excess glue. You should have no leaks and a nice clean look that way.

Cheers
Ray

Quote:
Originally Posted by Lance View Post
I have a Sedra pump powering two reactors in the sump, which is kind of silly since I have a Barracuda return pump that is only using about 70% capacity. I want to "T" off one of the return lines to feed the reactors.
My question is: How long should I allow the Weld-On P-70 primer and PVC 795 to dry before going back on-line? The can says 30 minutes cure time, but I don't trust that to a tank full of fish and corals. Anybody had any experience using Weld-On on a running tank? 24 hours or less/more?
__________________
60" 120G project-DONE!!!!
Reply With Quote