Electrical supply from mains board, it helps having a brother who can frame as well as being an electrical contractor!!!!!!
[IMG]

[/IMG]
The top up and water change will be carried out in the mechanical room with an RO unit plumbed into the mains supply, a bit more framing and the tanks were installed.
The display tank in the wall and the top up system are connected by a pipe in which all of the plumbing runs, it can be seen to the right and top of the frame holding the top up tanks:
[IMG]

[/IMG]