Quote:
Originally Posted by burrows14
I would much rather hard plumb than so hose. I was told to clue the fittings tho so I guess im stuck going with soft plumbing 
|
the 1/2" PVC joints are all cemented/glued except for the sockets that go into the reactors unions. Those pieces are just wrapped with a bit of Teflon tape and shoved in for a snug fit. It is just like the barbbed fittin that it comes with , those aren't glued, they just sit in the socket.
