Originally Posted by Parker
No, no you can't!  Not because I don't want to show you but because it isn't fully built yet. When I plumed the tank I added a tee and a valve to the return plumbing for future implemention of a manifold to run everything. Because the tank is so lightly stocked I haven't had a need to finish it yet, but will be shortly.
You can see the tee and valve in the upper right hand side of the picture.
|
Ok so, my next question is, are you running 1.5" pipe? How are you going to "ramp down" to the size required for your reactor? Would you do that at the barb fitting? I'm just wondering where along the line should I start to reduce plumbing sizes since my phosban reactor is 3/8"