So here is an update.
I started the plumbing for the sump today getting the return line done:
Then I built my durso standpipes for dual corner overflows:
And finally I did the overflow to sump line's:
Next will be the 30w UV that I have to figure out where it will go so it is not in the way of the closed loop I have planned. Still need to find a 45mm & 65 mm glass drill bit that are not to expensive to drill for the loop.