I'll be honest and say I didn't permit for the electrical I did for my tank. If it becomes a problem when I sell the house then I'll yank them out, it would take me all of an hour. I had an electrician friend of mine look it over, said it's all good.

I do plan to finish off the unfinished portion of my basment with a bathroom and another spare beadroom and I will permit for those changes.

I didn't permit for the reno's to the main floor but I technicaly didn't move anything, plumbing didn't change, electrical didn't change, a couple outlets may have been moved a few feet but nothing was rewired. I could get hasseled for removing a load bearing wall and putting in a header but that can be inspected from the attic if I ever needed to have it done.