Quote:
Originally Posted by Carmen
Neat looking tank Josh! Kinda like it! The shallow depth makes it look longer! Will grow some awesome SPS I am sure!
|
Kinda like it?!? Come on!
It does give a bit of an illusion of length... (don't even think about the jokes guys!!!)
Anyways, finally finished up my plumbing tonight.
Starting off where my last pic left... the under side of the overflow. Running a gate valve for the Herbie. I mounted a couple of L-brackets to my stand to help support the drains and reduce any torsion/pressure on the bulkheads.
From there, into the sump, which STILL needs baffles..

Doesn't sound like I will be getting them before I leave Saturday, and even if I did, the silicone probably wouldn't have enough time to cure, so couldn't add water anyways.
From the return pump I added in a T to branch off a ball valve. This will allow me to do a water change without shutting down my return pump. Open the lower valve, and shut the top one. I always like connecting the pump to the return line with hard plumbing, comes down to millimeters to get it all lined up properly.
And finally, up the backside. Union Check Valve for the "just in case" moments. I would have liked to add another ball valve between the check valve and the top union so I could remove the Check Valve for maintenance, however it would be CLEARLY visible through the tank glass and I didn't want that. When the time comes to switch out the Check valve I will just plan a big enough water change to bring my water level below my return bulkhead.
That's about it for now, until I get the baffles for the sump.. Need to hunt down a skimmer next, then finish up with lighting, and add my sandbed.... and then aquascape, and and and.....