For the past week I've been tying up all of the loose ends before the big move. I managed to get the bar and room finished, well, as far as a I can for now.
I moved the fuge and sump first so that I could get 90% of the plumbing done before the tank move. Here's a shot of them. The tank drains to the fuge where I have my 2 stage GFO/NO3 reactor as well as macros and some live rock chunks.
Then from the fugethe water drains into the sump. I have my ASM G3 skimmer, carbon bag, filter sock, heater, PH probe, thermometer sensor and return pump all situated in the sump.
You can see on the right that I used a one way check valve and union for the return line. I ran it into my SQWD and then up to the tank via mostly 1" line. With all of that plumbing I figure I went from a 950 GPH pump to only 600-650 GPH. I guess thats fine seeing as how it only runs out of one exit at a time.
