id wait an hour before i pressurized it checking the flow down to the sump an hour is plenty but id wait a day before i checked the return piping
__________________
250G DD LED SPS R.I.P.
180G LED SPS
80"x36". 300G custom build
Owner of Mountain Ridge Heating and Gas
Class A gas fitter, HVAC
|