Quote:
Originally Posted by JDigital
+1... 187g+30g sump with a 75gpd unit...  2.89 Days... 
|
I'd say lets have a race, but I think you would win LOL.
Is it just me, or does it seem that a RO unit slows down after a day? I was filling a bunch of Rubbermaid totes, and the first one was WAY faster than the last.