It has begun...
If you remember this from a little while ago, this is now what constitutes a before shot.
Then there was this...me being silly, and its starting to become a tradition. I did it on the 230g build, and I did it tonight!
Some "quality" work had been done before hand putting up this wall. The studs ranged from 22" to 26" on center. The electrical wiring is also running quite hot to the touch. Kevin believes its aluminum. He also wants to re-route plumbing, electrical, and the heating vents while the ceiling is down.
Next we knocked down the wall to expose the extra ghetto bathroom we have in the basement.
The ducting that has an offset with no purpose. The offset is the reason for the bulkhead. When we re-route everything we'll be downsizing the pipe, assuming its okay to do so.
Where we've left off. There is still clean up to do, and a lot more ceiling to pull down.
My new little tang did eat today, and the aggression between all the fish has diminished to almost nothing. I'm still waiting in hopes of getting a photo or two for ID.
I also wish that I'd purchased better quality garbage bags. Those, along with a wet/dry shop vac is on the list of stuff to purchase in the near future.