Well, after many months and redos, the tank is ready for a freshwater test. We had to rebuild the stand 6" higher, as there was not enough room to run the plumbing. With a ledge on the front, it should be just perfect for bar height.
Here's the empty tank waiting for water.
Here's the sump and plumbing. Water looks a little discolored because it's a test with our well water. A little bit of iron in the water.
