Quote:
Originally Posted by StirCrazy
I would use schedual 10 if there was such a thing  sched 40 is even way overkill for what we do. how often do we run 150 PSI on our systems?
almost any bulkhead that fails is from inproper instalation, or a defect in the bulkhead its self, not because it is a cheap one or it is schedual 40.
Steve
|
I won't use less than sched40 but not because of the pressure rating. I have used sched20 in the past but if it's something you are going to keep for more than maybe 5 years it gets really brittle. I had an old piece off of my uv I was able to crush just squeezing it in my hand.