Quote:
Originally Posted by Kronk
Awesome that was the way i was designing mine, with two drains from the tank one into the fuge and one into the skimmer chamber. Any chance you have pics ?
|
You can also have the two drains going to the skimmer chamber and tee off the one pipe
add a valve so you can control the flow throw the fuge and the rest will go in the skinner
chamber.