Anyhow, more pictures!
Next up was to build some wall framing and hang a door for access into the tank room.
Seems that maybe not going about things the easiest way, but, I want walls to be flush, or near to flush with the tank, as opposed to having the walls a 2x4 thickess out from the tank.
Also, I wanted to avoid the usual "picture frame" look to a typical inwall tank because my favourite tanks are those that can be looked at from multiple angles. Ideally, if I had had the space, I would have made three sides viewable, but unfortunately I just don't have enough space to pull it off ... so the end result is the best compromise I could do, a "front and right-hand side viewable" tank.
As you can see, I haven't bothered draining the tank yet from my "verify the tank is level" step.

That's some skanky water now, but I'm leaving it for now because I'll use it to test my plumbing when I have that ready (hopefully soon). Seems to me there's no need to waste 280g of water in the meantime.
Here's a close up of the furnace piping. "If I knew then what I know now", I'd have sprung for 9' ceilings in the basement. With 8', there are definitely a lot of low spots to work around due to things like this.
