View Single Post
  #1  
Old 05-20-2007, 07:03 PM
trilinearmipmap trilinearmipmap is offline
Member
 
Join Date: Feb 2003
Location: Prince Rupert B.C.
Posts: 1,213
trilinearmipmap is on a distinguished road
Default Securing feed and effluent lines for a calcium reactor

I am setting up a new calcium reactor.

I need to secure the water feed line and effluent line somehow in the sump. This reactor design draws water in without a feed pump. It uses the hard plastic water hose that fits John Guest speedfit fittings.

What is a good way to secure the water hoses in the sump?

Also should the output hose from the calcium reactor drip into the sump from a height, or be submerged in the water?
Reply With Quote