today i bought my equipment for my saltwater mixing. i 33gallon garbage can, GX 6000 pump to push the new water up to my sump on the main floor. i also installed my RO/DI unit and started flushing the system, i'm still waiting to get the fittings for it to do a final install. i installed the plumbing in the wall and through my cold air duct of the furnace to the main floor and installed 2 cable mounting plates and drilled the holes out to fit the RO line and the new salt water line. a neater install will be done in the basement once i get the remainging fittings for the RO. let me know what you think, and if someone would let me know how to make the pictures bigger on the post that would be awesome
this is the wall outlets where the lines will come through
this is the plumbing in the floor joists going in to the cold air duct

here is the mixing bucket roughed in
here is the RO/DI installed and roughed in just flushing out
