I have an allglass 180G 72x24x24 that I had delivered to the basement. It took 4 very strong men to get it down into the basement and they were exhausted when finished. They carried it on end step by step. They decided to do it upright, their second choice was to take a window out and slide it in through the hole. This would have made them take some of the siding off the outside of the house to enable them to take the window out.
Tom R
|