Hello,
Remove the standpipe or durso from your overflow box, and shut the pumps off.
Let the boxes drain, and cut the pipe just after the flawed joint, leaving about 1" extra.
Make sure all water is dried up aound the new cut, and glue a slip x slip coupling onto it .
The coupling should butt up against the flawed joint when glued and pressed on, so make sure when the cut is made that you dry fit it to ensure that it will.
Marc.
__________________
Confucious say : Things that come to those who wait, will be things left over by those who didnt.
|