Just be careful about using sched-40 versus sched-80 bulkheads. The hole size needed is going to be different. For the most part sched-40 is more than adequate for our needs, we're not pumping up our water lines to 100psi (well .. except for maybe the RO feed and so on, but that's different). Sched-80 is a lot beefier (much more so than needed for our needs, we're not pressurizing the tanks).
__________________
-- Tony
My next hobby will be flooding my basement while repeatedly banging my head against a brick wall and tearing up $100 bills. Whee!
|